{"id":29156,"date":"2026-05-12T17:02:25","date_gmt":"2026-05-12T11:32:25","guid":{"rendered":"https:\/\/www.aicerts.ai\/news\/"},"modified":"2026-05-12T17:02:26","modified_gmt":"2026-05-12T11:32:26","slug":"hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks","status":"publish","type":"news","link":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/","title":{"rendered":"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks"},"content":{"rendered":"\n<p>First, the International Energy Agency projects global <strong>data centers<\/strong> will consume about 945 TWh by 2030. Secondly, grid interconnection queues in <strong>North America<\/strong> grow longer each quarter. Therefore, many developers now pursue behind-the-meter generation as a workaround. Hitachi\u2019s partnership signals momentum for this model.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/aicertswpcdn.blob.core.windows.net\/newsportal\/2026\/05\/substation-inspection.jpg\" alt=\"Engineers inspecting AI Energy infrastructure at a grid substation\"\/><figcaption class=\"wp-element-caption\">Engineers on site help move major power projects from concept to construction.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Global Demand Surge Drivers<\/h2>\n\n\n\n<p>IEA Executive Director Fatih Birol recently warned that AI will more than double data-center load within five years. Moreover, the agency notes that AI workloads already shape regional planning studies. Those forecasts put unprecedented strain on existing <strong>power<\/strong> grids. Meanwhile, hyperscalers like Google, Microsoft, and Amazon aggregate multi-gigawatt renewable portfolios.<\/p>\n\n\n\n<p>Behind-the-meter energy parks offer speed. They bypass many utility approvals and provide dedicated capacity. Consequently, CIOs gain schedule certainty for server deployments. The <strong>AI Energy infrastructure<\/strong> concept thrives on that certainty.<\/p>\n\n\n\n<p>These growth signals underscore urgent capacity needs. However, technical hurdles still loom. Nevertheless, developers remain confident. The next section unpacks the energy-park blueprint.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Energy Park Concept Explained<\/h2>\n\n\n\n<p>An energy park integrates generation, storage, and transmission assets behind one interconnection. Typically, solar, wind, battery storage, and advanced EMS tools sit inside a single perimeter. Consequently, on-site loads receive firm, flexible <strong>power<\/strong> without relying on distant substations.<\/p>\n\n\n\n<p>Hitachi defines the model as \u201cDC-architected electrical solutions.\u201d X LABS frames it as Energy-as-a-Service, delivered through special-purpose vehicles. Furthermore, the parks target one gigawatt or more per site.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Generation: utility-scale solar plus possible gas peakers for reliability<\/li>\n\n\n\n<li>Storage: multi-gigawatt-hour batteries balancing volatile AI workloads<\/li>\n\n\n\n<li>Control: digital EMS optimizing dispatch and market participation<\/li>\n<\/ul>\n\n\n\n<p>Such integration offers three major benefits. First, faster timelines. Second, predictable costs through long-term service contracts. Third, optional grid support when surplus energy flows outward.<\/p>\n\n\n\n<p>The architecture accelerates <strong>AI Energy infrastructure<\/strong> adoption. However, success requires experienced partners. The following section reviews how <strong>Hitachi<\/strong> and X LABS plan to deliver.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hitachi Alliance Key Details<\/h2>\n\n\n\n<p>The January 2026 collaboration agreement assigns clear roles. X LABS SPVs handle land acquisition, financing, and local permitting. Meanwhile, <strong>Hitachi<\/strong> provides high-voltage equipment, digital control platforms, and global procurement muscle. Jun Taniguchi, Hitachi Energy\u2019s COO, said the venture will supply \u201cGW-scale, DC-architected solutions\u201d for AI clusters.<\/p>\n\n\n\n<p>Both companies target first-park completion in the early 2030s. A potential Utah site sits under evaluation. Additionally, other <strong>North America<\/strong> locations remain under review. Financing will leverage institutional capital that already pursues contracted infrastructure.<\/p>\n\n\n\n<p>Professionals can enhance their expertise with the <a href=\"https:\/\/www.aicerts.ai\/certifications\/cloud\/ai-architect\">AI Architect\u2122<\/a> certification. That credential deepens design skills for modern <strong>AI Energy infrastructure<\/strong> projects.<\/p>\n\n\n\n<p>This alliance merges engineering depth with financial agility. Consequently, competitive pressure will likely rise. Yet, policymakers still influence outcomes, as the next section explains.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Regulatory And Grid Roadblocks<\/h2>\n\n\n\n<p>Current interconnection rules seldom envision co-located gigawatt generation plus matching load. Consequently, projects face procedural uncertainty. The Brattle Group recommends a dedicated \u201cEnergy Park Integration\u201d pathway to streamline studies.<\/p>\n\n\n\n<p>Moreover, state regulators worry about market impacts. Large behind-the-meter assets can shift wholesale prices and utility revenue collection. In contrast, supporters argue that accelerated capacity relieves grid planners.<\/p>\n\n\n\n<p>Environmental reviews introduce another layer. Some designs include gas turbines to firm renewables, raising emissions debates. Nevertheless, careful site selection and technology stacking may mitigate community concerns.<\/p>\n\n\n\n<p>Regulation shapes feasibility for <strong>AI Energy infrastructure<\/strong>. Therefore, developers engage early with agencies across <strong>North America<\/strong>. The financial section illustrates how risk allocation addresses policy uncertainty.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Innovative Financing Structuring Insights<\/h2>\n\n\n\n<p>Energy parks demand billions in upfront capital. X LABS uses SPVs that blend equity from infrastructure funds with long-dated debt. Moreover, Energy-as-a-Service contracts secure revenue over 15-25 years. Consequently, lenders treat the assets like power plants rather than real estate.<\/p>\n\n\n\n<p>Institutional investors welcome the diversification. Reliable demand from <strong>data centers<\/strong> stabilizes cash flow. Additionally, merchant exposure reduces when storage arbitrage captures market spreads.<\/p>\n\n\n\n<p>Financial structuring also transfers operational complexity away from cloud clients. Operators simply pay a subscription for resilient <strong>power<\/strong>. That model mirrors cloud computing\u2019s pay-as-you-go ethos, reinforcing strategic alignment.<\/p>\n\n\n\n<p>Sound financing underpins scalable <strong>AI Energy infrastructure<\/strong>. However, cost discipline alone cannot guarantee project delivery. The outlook section explores remaining milestones.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">North America Future Pathways<\/h2>\n\n\n\n<p>X LABS lists several candidate zones across Utah, Texas, and Virginia. Meanwhile, <strong>Hitachi<\/strong> continues surveys for grid-support synergies. Early engineering suggests that multi-gigawatt solar and battery combinations will dominate configurations.<\/p>\n\n\n\n<p>Consequently, regional renewable supply chains should expand. Furthermore, flexible inverters and advanced transformers become critical exports. Stakeholders expect allied industries to generate thousands of skilled jobs across <strong>North America<\/strong>.<\/p>\n\n\n\n<p>Analysts see first-mover advantages. Hyperscalers that secure parks lock in clean <strong>power<\/strong> and predictable costs. Nevertheless, long permitting timelines mean action must start now.<\/p>\n\n\n\n<p>Upcoming announcements will reveal site locations, anchor tenants, and technology mixes. Those disclosures will signal how quickly <strong>AI Energy infrastructure<\/strong> scales from concept to reality.<\/p>\n\n\n\n<p>These forward steps highlight momentum. However, vigilance remains vital as markets and policies evolve.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Conclusion<\/h3>\n\n\n\n<p>Hitachi and X LABS plan gigawatt energy parks that align grid innovation with soaring AI demand. Moreover, their SPV model distributes risk while accelerating delivery for <strong>data centers<\/strong>. Regulatory reform, robust financing, and technology integration will decide the pace of progress across <strong>North America<\/strong>.<\/p>\n\n\n\n<p>Consequently, professionals must master systems thinking, market design, and resilient <strong>power<\/strong> operations. Ambitious leaders can gain a competitive edge through the linked <a href=\"https:\/\/www.aicerts.ai\/certifications\/cloud\/ai-architect\">AI Architect\u2122<\/a> certification. Embrace the future of <strong>AI Energy infrastructure<\/strong> and help engineer reliable, sustainable capacity for the digital age.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cloud demand keeps climbing, and electricity supply struggles to keep pace. Consequently, hyperscale operators search for faster, cleaner solutions. The newly announced Hitachi\u2013X LABS collaboration places AI Energy infrastructure at the center of that search. Their plan: build gigawatt-scale \u201cenergy parks\u201d that sit directly beside next-generation data centers. Industry watchers highlight two forces converging. <\/p>\n","protected":false},"featured_media":29152,"parent":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_yoast_wpseo_focuskw":"AI Energy infrastructure","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"Hitachi and X LABS advance AI Energy infrastructure with gigawatt parks, easing grid delays and powering North America data centers.","_yoast_wpseo_canonical":""},"tags":[38997,39000,38999,39001,38998],"news_category":[4,6,7],"communities":[],"class_list":["post-29156","news","type-news","status-publish","has-post-thumbnail","hentry","tag-behind-the-meter-2","tag-energy-parks","tag-energy-as-a-service","tag-north-america-power","tag-x-labs","news_category-ai","news_category-machine-learning","news_category-prompt-engineering"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks - AI CERTs News<\/title>\n<meta name=\"description\" content=\"Hitachi and X LABS advance AI Energy infrastructure with gigawatt parks, easing grid delays and powering North America data centers.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks - AI CERTs News\" \/>\n<meta property=\"og:description\" content=\"Hitachi and X LABS advance AI Energy infrastructure with gigawatt parks, easing grid delays and powering North America data centers.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/\" \/>\n<meta property=\"og:site_name\" content=\"AI CERTs News\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T11:32:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aicertswpcdn.blob.core.windows.net\/newsportal\/2026\/05\/energy-park-dusk.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/\",\"url\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/\",\"name\":\"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks - AI CERTs News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/aicertswpcdn.blob.core.windows.net\\\/newsportal\\\/2026\\\/05\\\/energy-park-dusk.jpg\",\"datePublished\":\"2026-05-12T11:32:25+00:00\",\"dateModified\":\"2026-05-12T11:32:26+00:00\",\"description\":\"Hitachi and X LABS advance AI Energy infrastructure with gigawatt parks, easing grid delays and powering North America data centers.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/#primaryimage\",\"url\":\"https:\\\/\\\/aicertswpcdn.blob.core.windows.net\\\/newsportal\\\/2026\\\/05\\\/energy-park-dusk.jpg\",\"contentUrl\":\"https:\\\/\\\/aicertswpcdn.blob.core.windows.net\\\/newsportal\\\/2026\\\/05\\\/energy-park-dusk.jpg\",\"width\":1024,\"height\":576,\"caption\":\"A utility-scale site like this could support faster data center growth.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/\",\"name\":\"Aicerts News\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/#organization\",\"name\":\"Aicerts News\",\"url\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/news_logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/news_logo.svg\",\"width\":1,\"height\":1,\"caption\":\"Aicerts News\"},\"image\":{\"@id\":\"https:\\\/\\\/www.aicerts.ai\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks - AI CERTs News","description":"Hitachi and X LABS advance AI Energy infrastructure with gigawatt parks, easing grid delays and powering North America data centers.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/","og_locale":"en_US","og_type":"article","og_title":"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks - AI CERTs News","og_description":"Hitachi and X LABS advance AI Energy infrastructure with gigawatt parks, easing grid delays and powering North America data centers.","og_url":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/","og_site_name":"AI CERTs News","article_modified_time":"2026-05-12T11:32:26+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/aicertswpcdn.blob.core.windows.net\/newsportal\/2026\/05\/energy-park-dusk.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/","url":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/","name":"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks - AI CERTs News","isPartOf":{"@id":"https:\/\/www.aicerts.ai\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/#primaryimage"},"image":{"@id":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/#primaryimage"},"thumbnailUrl":"https:\/\/aicertswpcdn.blob.core.windows.net\/newsportal\/2026\/05\/energy-park-dusk.jpg","datePublished":"2026-05-12T11:32:25+00:00","dateModified":"2026-05-12T11:32:26+00:00","description":"Hitachi and X LABS advance AI Energy infrastructure with gigawatt parks, easing grid delays and powering North America data centers.","breadcrumb":{"@id":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/#primaryimage","url":"https:\/\/aicertswpcdn.blob.core.windows.net\/newsportal\/2026\/05\/energy-park-dusk.jpg","contentUrl":"https:\/\/aicertswpcdn.blob.core.windows.net\/newsportal\/2026\/05\/energy-park-dusk.jpg","width":1024,"height":576,"caption":"A utility-scale site like this could support faster data center growth."},{"@type":"BreadcrumbList","@id":"https:\/\/www.aicerts.ai\/news\/hitachi-x-labs-bet-big-on-ai-energy-infrastructure-parks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.aicerts.ai\/news\/"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/www.aicerts.ai\/news\/news\/"},{"@type":"ListItem","position":3,"name":"Hitachi, X LABS Bet Big on AI Energy Infrastructure Parks"}]},{"@type":"WebSite","@id":"https:\/\/www.aicerts.ai\/news\/#website","url":"https:\/\/www.aicerts.ai\/news\/","name":"Aicerts News","description":"","publisher":{"@id":"https:\/\/www.aicerts.ai\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.aicerts.ai\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.aicerts.ai\/news\/#organization","name":"Aicerts News","url":"https:\/\/www.aicerts.ai\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.aicerts.ai\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.aicerts.ai\/news\/wp-content\/uploads\/2024\/09\/news_logo.svg","contentUrl":"https:\/\/www.aicerts.ai\/news\/wp-content\/uploads\/2024\/09\/news_logo.svg","width":1,"height":1,"caption":"Aicerts News"},"image":{"@id":"https:\/\/www.aicerts.ai\/news\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/news\/29156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/types\/news"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/comments?post=29156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/media\/29152"}],"wp:attachment":[{"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/media?parent=29156"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/tags?post=29156"},{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/news_category?post=29156"},{"taxonomy":"communities","embeddable":true,"href":"https:\/\/www.aicerts.ai\/news\/wp-json\/wp\/v2\/communities?post=29156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}